rocksresort: Fourth construction phase

After the tenth and eleventh cubes of the rocksresort were opened in 2021 on the site of the former Freestyle Academy parking lot, two more buildings followed in 2025 – House L and House M. To make room for the buildings, the Freestyle Academy was demolished and relocated to the basement on the same site. With the opening of Houses L and M, the rocksresort now comprises thirteen houses with a total of 248 apartments and 1,319 beds.

New parking options

In addition, new parking spaces were created, spread over two basement levels. These were connected to the existing parking garage for buildings I, J, and K and can also be accessed via its entrance. The parking garage opened in spring 2024.

 

About the rocksresort

As a member of DesignHotels™, the rocksresort impresses with its timeless architecture, unique interior design, regional materials, and a special lighting concept. The cubic buildings made of solid Vals quartzite are not only architecturally avant-garde. During their construction, the focus was on the responsible and sustainable use of resources and the environment. All buildings are constructed as Minergie buildings and meet the highest energy efficiency standards. With its proven "buy to use and let" concept, the rocksresort offers its guests year-round relaxation in the Flims Laax destination, even at short notice.

details

2022

Parking garage: Spring 2024

Houses: Winter/Spring 2025

Domenig Architects, Chur

  • Exclusive design
  • New apartments
  • "Buy to use and let" concept
  • High-quality and natural building materials
  • Genuine Vals quartzite from the region
  • Ski-in ski-out hotel

Other projects

September 13, 2024

8-seater gondola Crap Masegn – Fuorcla – Vorab

Learn more

April 23, 2024

New construction of the Freestyle Academy LAAX

Learn more

March 15, 2024

Modernization of the motor for the Crap Masegn aerial tramway

Learn more