6-seater chairlift Treis Palas – Crap Masegn

Sesselbahn laax skigebiet treis palas alpen tourismus investments

With the new 6-seater chairlift Treis Palas – Crap Masegn, guests enjoy fast transport with maximum comfort. The new lift travels six metres per second. But speed is not the only convenience. Like the 6-seater chairlift Alp Dado – Crest la Siala (built in 2011), seat heating and a weather protection bonnet ensure a pleasant and dry ride in any weather. The Kids Stop ensures the safety of the smallest guests.

1448

Metres travel distance

2121

m.a.s.l. (base station)

2471

m.a.s.l. (top station)

Details

Completed

November 2012

Leitner AG, Sterzing

  • Conveying capacity: 1800 p/h initial extension, 2400 p/h final extension
  • Number of chairs: 45 initial extension, 60 final extension
  • Driving speed: 6 m/s

  • Heated seats
  • Weather protection bonnet
  • Kids-Stop

More projects

16. October 2023

Decarbonisation of the heating system at Berghaus Nagens

Read more

15. June 2023

FlemXpress: Lift access to the Tectonic Arena Sardona UNESCO World Heritage Site

Read more

11. January 2023

Construction of the New KIDS Freestyle Academy

Read more